Address Approval
🔽 Agency
Bureau of engineering
🔽 Description
Address approval for residential addition/alteration creating additional unit(s)
🔽 Difficulty
Should be easy to get
Engineering Processing Fee
🔽 Agency
Bureau of engineering
🔽 Description
The fee authorized by Ord. 176,300 for PW/Eng to process clearance(s) for LADBS issued permits
🔽 Difficulty
Should be easy to get
Roof and/or site drainage to street
🔽 Agency
Bureau of engineering
🔽 Description
Roof and/or site drainage to street
🔽 Difficulty
Should be easy to get
Sewer availability and connection
🔽 Agency
Bureau of engineering
🔽 Description
Sewer availability and connection
🔽 Difficulty
Should be easy to get